Beelman Ready-Mix and Concrete Supply of Illinois
  • Ready Mix Delivery
  • Rock Delivery
  • Volume Calculator
  • Locations
  • Projects
  • About
    • Our Team
    • Careers
    • Blog
  • Contact
  • Menu Menu

How to Read a Concrete Batch Ticket: What the Numbers on Your Delivery Receipt Mean

Every concrete delivery comes with a paper trail. The concrete batch ticket is more than a receipt. It’s the quality control record for every load that rolls off the truck, confirming what was batched, how much was loaded, and whether the mix matches your specification. Most crews glance at it and sign. Knowing how to read one means you can catch a problem before the first yard hits the form.

At a Glance:

  • The concrete batch ticket is the official quality document for every ready mix load
  • Concrete PSI is the specified compressive strength at 28 days
  • Slump measures workability and signals whether water was added in transit
  • The mix design code ties every load to the approved specification
  • Timing fields tell you when the load must be discharged

What a Concrete Batch Ticket Contains

The concrete batch ticket documents the full record from the batch plant to your site. It covers the mix design, material weights, load quantity, and batch timing. Reviewing every section, not just the flagged numbers, gives you a complete picture of the material you’re about to place.

Batch Plant and Load Identification

The top section identifies the originating plant location, truck number, ticket number, batch time, and driver on record. These fields establish a chain of custody from plant to pour. The ticket number is your reference for any follow-up with the supplier. When multiple loads are running, verify numbers are sequential and match your delivery schedule.

The Concrete Mix Design Code

Below the plant information is the concrete mix design code, the approved specification your engineer signed off on. It defines cement type and amount, aggregate gradations, admixtures, and the target water-cement ratio. On IDOT-approved jobs, the mix design code on the concrete batch ticket must match the approved documentation on file. A mismatch here is a rejection before a yard is placed.

The Numbers That Determine Whether a Load Is Acceptable

The data fields at the center of the concrete batch ticket are your quality control checkpoints. They confirm what was actually batched and whether it meets your project requirements. Understanding each one and the acceptable range for your job is how you protect the work and the inspection.

Concrete PSI

Concrete PSI is the specified compressive strength, the force per square inch the cured mix is designed to reach at 28 days. Residential flatwork typically calls for 3,000 PSI. Commercial and structural pours often require 4,000 PSI or higher. The value on the ticket is the design target. Curing conditions, water additions, and placement practices all affect whether the final product reaches it.

Concrete Slump

Concrete slump measures workability. A slump cone test records how many inches fresh concrete settles, typically 3 to 5 inches for most applications. A reading above the specified range usually means the mix is more fluid than ordered, often because water was added in transit. Hot weather accelerates slump loss and increases the likelihood of job-site water additions. For a deeper look at how temperature changes what your mix needs, see how hot and cold weather affect concrete pours.

Water-Cement Ratio

The water-cement ratio, listed as w/c on most tickets, is a strong predictor of long-term durability. A lower ratio means denser, stronger concrete. Most structural specifications target a w/c ratio between 0.40 and 0.50. When the number on the batch ticket exceeds the approved design, it’s a durability problem, not a workability preference.

Beelman Ready Mix delivers IDOT-approved concrete with accurate batching and dependable service across Illinois and the St. Louis metro area. Check out more about what we offer.

Our Ready Mix Solutions

What Admixtures and Air Content Tell You

Two fields on the concrete batch ticket that crews commonly overlook carry significant weight for finished performance: admixtures and air content. Both are listed on every ticket, and both affect whether the concrete you place will hold up over time.

Admixtures

Admixtures are chemical additions to the mix beyond cement, aggregate, and water. The ticket lists each one by type and dosage. The most common are water reducers, which improve workability without adding water; accelerators, which speed up set time in cold conditions; and retarders, which slow set time in heat. Air-entraining agents are also listed here when specified. If your project called for an accelerator and the ticket shows none was added, that’s a conversation to have before the truck discharges. Dosages outside the approved range can affect both workability and strength, and the ticket is the only record you have.

Air Content

Air content is the percentage of air intentionally entrained in the mix, typically between 5 and 7 percent for exterior flatwork exposed to freeze-thaw cycles. IDOT specifications require air entrainment on most flatwork and pavement applications in Illinois. A result below the specified range means the mix has less protection against freeze-thaw damage. A result significantly above it can reduce compressive strength. Check this field against your project spec the same way you check PSI and slump. The number on the ticket at the time of batching is the baseline. Air content can change during transit and placement, but a reading that’s already out of range at the plant is a problem before the truck leaves.

Quantity, Yield, and Load Timing Fields

The final sections of the ticket cover load quantity, theoretical yield, and discharge time limits. These fields are easy to overlook under pressure, but each one carries real consequences for spec compliance.

The quantity field shows the cubic yards batched for the load. Compare it against your volume calculator estimate before the driver begins discharge. If the ticket shows more or fewer yards than ordered, sort it out before the pour starts. The yield field reflects the actual volume the batch weights will produce, which may differ slightly from what was ordered.

The timing fields are equally important. Batch time and arrival time establish how long the load has been in the drum. ASTM C94 requires discharge within 90 minutes of batching or 300 drum revolutions, whichever comes first. A load caught in traffic on a hot afternoon can hit that limit before it reaches your site. If it does, reject it.

Verify Every Load With Beelman Ready Mix

A concrete batch ticket is only useful when your crew knows what to look for. The numbers confirm whether the load was batched correctly, whether the material is within spec, and whether it’s safe to place. Making that review standard practice on every delivery protects your project from rework and failed inspections.

Beelman Ready Mix supplies IDOT-approved batch plant concrete across Illinois and the St. Louis metro area. Every load arrives with a complete ticket and a team committed to getting the numbers right. Request a Quote and put dependable ready mix delivery to work on your next project.

Share This Post

  • Share on Facebook
  • Share on X
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share on Tumblr
  • Share on Vk
  • Share on Reddit
  • Share by Mail

More Like This

Jeff Color Concrete 2025

Different Types of Concrete Mix and When to Use Each

https://www.beelmanreadymix.com/wp-content/uploads/2025/07/Jeff-Color-Concrete-2025.jpg 1250 2000 Abstrakt Marketing /wp-content/uploads/2025/07/Beelman-and-CSI-Logo-Horizontal-V2.svg Abstrakt Marketing2026-08-18 13:01:022026-08-18 13:01:07Different Types of Concrete Mix and When to Use Each

Categories

  • Aggregate Rock
  • Concrete Estimation
  • Construction Workflow Optimization
  • Ready Mix Concrete
  • Ready Mix Concrete Delivery
  • Ready Mix for Solutions for Contractors
Beelman + Csi Logo White V2

Resources

About

Leadership Team

Careers

Projects

Locations

Solutions

Ready Mix Concrete Delivery

Rock Delivery

Volume Calculator

 

Contact

1 Racehorse Drive,
East Saint Louis, IL 62205

BRM: (618) 247-3866

CSI: (618) 332-2137

Website by Abstrakt Marketing Group ©
    • Sitemap
    • Privacy Policy
    Link to: Different Types of Concrete Mix and When to Use Each Link to: Different Types of Concrete Mix and When to Use Each Different Types of Concrete Mix and When to Use EachJeff Color Concrete 2025
    Scroll to top Scroll to top Scroll to top

    This site uses cookies. By continuing to browse the site, you are agreeing to our use of cookies.

    AcceptLearn more

    Cookie and Privacy Settings



    How we use cookies

    We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

    Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

    Essential Website Cookies

    These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

    Because these cookies are strictly necessary to deliver the website, refusing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

    We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

    We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

    Other external services

    We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

    Google Webfont Settings:

    Google Map Settings:

    Google reCaptcha Settings:

    Vimeo and Youtube video embeds:

    Accept settingsHide notification only